Chapter 2: Needs assessment-based planning process (4)
5 3 月, 2025
Once department needs have been projected and regulatory needs1 are identified, the assistance of an architectural firm (or design team) can be obtained. The design team will provide the department with preliminary drawings for reviewing department concepts and compliance with regulatory agencies2. In many cases, the building committee serves as an interface between department hierarchy and the design team. (P.16)